28
Jul 2020
- BY Michael Price
- WITH 0 COMMENTS
- PERMALINK
- STANDARD POST TYPE
![](https://www.vipsteel.co.nz/wp-content/uploads/2021/09/vip_steel_cathedral_west_wall_install_171220_small_81.jpg)
We’re proud to be working on such an iconic project in the heart of Christchurch City – the Christ Church Cathedral Reinstatement!
The key stages are:
1. Pre-construction
2. Cathedral Stabilisation – (current works 2021)
3. Cathedral Strengthening and Reinstatement
4. Ancillary Buildings and Tower
Recent Comments